On January 16th, 2017 a Solenco Powerbox has been installed at the premises of Wilhelm Hedden in the framework of the EC Project NETfficient.

 

 

1. Plant of Wilhelm Hedden


2.Tradename


3.Power box (left) + storage box (right)


4.Detailed view of Powerbox


5. Detailed view of Powerbox


6.Detailed view of Powerbox


7.Control of communication system


8. Powerbox in operation


9.Borkum Stadwerke representative Olaf Look (left) and Project Leader Francisco Lopez (right)


10.Borkum Stadwerke representatives Gerhard Begemann (left) and Olaf Look (right)